Supply and Installation of Spectrometer based photoreactor at IIT Bhilai
| December 22, 2021 | January 17, 2022 |
Civil works at IIT Bhilai during the year 2021 - 2022 | December 21, 2021 | December 27, 2021 |
Supply and Installation of Low Frequency Noise Measurement Setup at IIT Bhilai
| December 15, 2021 | December 31, 2022 |
Supply and Installation of 2kW Fiber Laser System at IIT Bhilai
| December 08, 2021 | January 18, 2022 |
Supply and Installation of Data Acquisition Card at IIT Bhilai | December 06, 2021 | January 04, 2022 |
Supply and Installation of Hot and Cold Rolling Mill at IIT Bhilai | November 25, 2021 | December 28, 2021 |
Catering and mess Service at IIT Bhilai
| November 17, 2021 | December 02, 2021 |
Supply and Installation of Probe Station at IIT Bhilai
| November 03, 2021 | December 01, 2021 |
Supply, Installation and Commissioning of Flash Chromatography System with Accessories at IIT Bhilai
| October 28, 2021 | November 22, 2021 |
Supply and Installation of Fluorescence Microscope at IIT Bhilai
| October 27, 2021 | November 25, 2021 |
Providing Web services for DSAI Courses at IIT Bhilai | October 14, 2021 | November 03, 2021 |
Supply and Installation of Hall Effect Measurement System at IIT Bhilai
| October 11, 2021 | November 10, 2021 |
Supply and Installation of High-Speed Confocal Laser Scanning Microscope with Incubator Facility at IIT Bhilai
| October 05, 2021 | November 04, 2021 |
Supply of Lab Consumables at IIT Bhilai | October 08, 2021 | November 01, 2021 |
Supply and Installation of High Resolution Transmission Electron Microscope with accessories at IIT Bhilai
| October 29, 2021 | November 09, 2021 |
Supply and Installation of Maskless Photolithography with UV Direct Laser Writer at IIT Bhilai
| September 29, 2021 | October 29, 2021 |
Supply, Installation and Commissioning of Automated Column chromatography for molecular separation with accessories at IIT Bhilai
| September 09, 2021 | October 06, 2021 |
Supply and Installation of Spectral Domain Based High-Speed Optical Coherence Tomography (OCT) System at IIT Bhilai | August 31, 2021 | September 28, 2021 |
Supply and Installation of USB Vision Camera with Zoom System and Accessories at IIT Bhilai | August 26, 2021 | September 21, 2021 |
Supply and Installation of Ellipsometer at IIT Bhilai
| August 17, 2021 | September 14, 2021 |
Supply and Installation of Time Resolved Photoluminescence Setup with Accessories at IIT Bhilai
| August 13, 2021 | September 11, 2021 |
Supply and Installation of Gamma Ray Spectrometer at IIT Bhilai | August 12, 2021 | September 15, 2021 |
Engagement of Internal Auditor for IIT Bhilai
| August 10, 2021 | September 02, 2021 |
Supply and Installation of Stir Casting Machine with accessories at IIT Bhilai | July 22, 2021 | August 17, 2021 |
Supply and Installation of Spectrometer with EMCCD Detector and Light Source at IIT Bhilai | July 19, 2021 | August 25, 2021 |
Supply and Installation of Maskless Photolithography with UV Direct Laser Writer at IIT Bhilai
| July 09, 2021 | August 10, 2021 |
Civil works at IIT Bhilai during the year 2021 - 2022 | July 06, 2021 | July 13, 2021 |
Supply and Installation of High Resolution Transmission Electron Microscope with accessories at IIT Bhilai | July 05, 2021 | August 09, 2021 |
Empanelment of potential supplier for laboratory chemicals, glassware and labware at IIT Bhilai | June 28, 2021 | July 15, 2021 |
Supply and Installation of Cryogen Free Closed Cycle Refrigerator at IIT Bhilai
| June 25, 2021 | July 19, 2021 |
Supply and Installation of Nuclear Magnetic Resonance (NMR) Spectrometer with accessories at IIT Bhilai | June 23, 2021 | July 29, 2021 |
Supply and Installation of Michelson Interferometer, Optical Fibre Experiment and Zeemann Effect Apparatus at IIT Bhilai | June 21, 2021 | July 15, 2021 |
Civil works at IIT Bhilai during the year 2021 - 2022
| June 14, 2021 | June 21, 2021 |
Supply of Function Generator at IIT Bhilai | June 04, 2021 | June 25, 2021 |
Supply of Turbo Molecular Pumping System at IIT Bhilai | May 19, 2021 | June 15, 2021 |
Supply and Installation of Langmuir Blodgett Trough at IIT Bhilai | April 29, 2021 | May 25, 2021 |
Supply and Installation of Scientific CMOS Camera at IIT Bhilai | April 16, 2021 | May 06, 2021 |
Supply and Installation of Ultrafast Ti:S Amplifier System with High Repetition Rate at IIT Bhilai | March 31, 2021 | April 30, 2021 |
Supply and Installation of Electro-Chemical Workstation at IIT Bhilai | March 31, 2021 | April 27, 2021 |
Supply and Installation of Semi-Automatic Horizontal Band Saw Machine at IIT Bhilai | March 31, 2021 | April 28, 2021 |
Supply and Installation of Portable Automatic Environmental Parameter Measurement Instrument at IIT Bhilai. | February 27, 2021 | March 17, 2021 |
Supply and Installation of DSP Evaluation Boards at IIT Bhilai | February 23, 2021 | March 10, 2021 |
Civil works at IIT Bhilai during the year 2020 – 2021 | February 11, 2021 | February 18, 2021 |
Supply of Gold Target for Sputtering at IIT Bhila | January 28, 2021 | February 11, 2021 |
Supply and Installation of Peltier Type Chiller with inbuilt flow switch and High Pressure pump at IIT Bhilai | January 11, 2021 | February 04, 2021 |
Supply and Installation of DSP Evaluation Boards at IIT Bhilai | January 05, 2021 | January 27, 2021 |
Supply, Delivery, Installation and Commissioning of Vibration Fundamental Training Kit | December 23, 2020 | January 20, 2021 |
Supply and Installation of Surface Activation and Etching Chamber at IIT Bhilai | December 21, 2020 | January 21, 2021 |
Supply and Installation of Automatic Flash Chromatography (AFC) System with Accessories at IIT Bhilai
| December 21, 2020 | January 19, 2021 |
Supply of Central Processing Units (CPUs) for EE Lab at IIT Bhilai | December 18, 2020 | January 11, 2021 |
Supply of Spectrometer with Optical Fibre and Laser Power Meter with Two Detector Heads at IIT Bhilai | December 09, 2020 | January 04, 2021 |
Supply and Installation of Source Measure Unit at IIT Bhilai | December 04, 2020 | December 28, 2020 |
Supply and Installation of Tool Room Container at IIT Bhilai | December 08, 2020 | December 30, 2020 |
Auction of Dismantled Material from fire affected wing of Castle Dio Hostel of IIT Bhilai, Sejbahar, Raipur | November 24, 2020 | December 08, 2020 |
RFP for Campus Wide Networking of IIT Bhilai Campus Development Design | November 09, 2020 | December 21, 2020 |
Supply and Installation of Colored Fast Capture Camera with Accessories at IIT Bhilai
| October 29, 2020 | November 28, 2020 |
Supply and Installation of 3D Scanning System at IIT Bhilai
| October 27, 2020 | November 26, 2020 |
Civil works at IIT Bhilai during the year 2020-21 | October 21, 2020 | October 28, 2020 |
Supply of Temperature and humidity sensors for real-time wireless measurements
The last date for submission of quotation is extended till 12-11-2020 3.00 PM. | October 20, 2020 | November 11, 2020 |
Supply and Installation of Ball Milling Setup at IIT Bhilai
| October 15, 2020 | November 12, 2020 |
Supply and Installation of Laser Engraving and Cutting Machine at IIT Bhilai | October 15, 2020 | November 11, 2020 |
Auction of Dismanteled Material from fire affected wing of Castle Dio Hostel of IIT Bhilai, Sejbahar, Raipur | October 14, 2020 | October 28, 2020 |
Supply, Installation, and Commissioning of Solvent Purification System With Accessories | October 13, 2020 | November 04, 2020 |
Supply, Delivery, Installation, and Commissioning of Rotary Evaporator and Chiller with Accessories
| October 13, 2020 | November 05, 2020 |
Supply, Delivery, Installation and Commissioning of Microwave Synthesizer with Accessories | October 09, 2020 | November 09, 2020 |
Supply and Installation and commissioning of HPC Cluster at IIT Bhilai | October 07, 2020 | November 03, 2020 |
Supply and Installation of Equipment for Microgrid and Renewable Integration Research and Studies | September 28, 2020 | October 26, 2020 |
Supply and Delivery of Honeycomb Optical Table with Mounting brackets
| September 23, 2020 | October 21, 2020 |
Supply, Delivery, Installation and Commissioning of Multimode Microplate Reader with Accessories | September 11, 2020 | October 19, 2020 |
Supply, Delivery, Installation and Commissioning of Vibration Fundamental Training Kit at IIT Bhilai
| August 29, 2020 | September 26, 2020 |
Supply and Installation of Low Temperature Immersion Cooler and Circulator at IIT Bhilai (Limited Tender Enquiry) | August 26, 2020 | September 23, 2020 |
Supply and Installation of High-Performance Liquid Chromatography (HPLC) System with Accessories at IIT Bhilai | August 26, 2020 | September 17, 2020 |
Supply, Installation, and Commissioning of CAM Software at IIT Bhilai (Limited Tender) | August 25, 2020 | September 21, 2020 |
Supply, Delivery, Installation, and Commissioning of Fluorescence Microscope with Accessories | August 25, 2020 | September 17, 2020 |
Supply and Installation of Thermal Coater at IIT Bhilai | August 20, 2020 | September 28, 2020 |
Supply and Installation of Optical Patterner at IIT Bhilai | August 19, 2020 | September 21, 2020 |
Supply and Installation of 3D Scanning System at IIT Bhilai
| August 19, 2020 | September 14, 2020 |
Request for Proposal for Empanelment of Consultants for Providing Third Party Quality Assurance (TPQA) Services for Various Construction Works at Permanent Campus of Indian Institute of Technology Bhilai
| August 11, 2020 | September 3, 2020 |
Annual Maintenance Contract for split air conditioners installed at transit campus of IIT Bhilai. | July 11, 2020 | July 21, 2020 |
Notice Inviting Tender for Students Insurance Policy | July 07, 2020 | July 16, 2020 |
Supply and Installation of Syringe Pump at IIT Bhilai | June 24, 2020 | July 20, 2020 |
Civil works at IIT Bhilai during the year 2020-21 | June 19, 2020 | June 26, 2020 |
Civil Works at IIT Bhilai during the year 2019-2020 Sub Head-Painting, Cleaning and Repair Works at GEC Auditorium, GEC Raipur, Sejbahar,Raipur C.G | April 22, 2020 | May 06, 2020 |
Auction of Dismanteled Material from fire affected wing of Castle Dio Hostel of IIT Bhilai, Sejbahar, Raipur. | March 2, 2020 | March 17, 2020 |
Housekeeping services for Transit Campus and extensions of IIT Bhilai.
| March 2, 2020 | April 2, 2020 |
Electrical works at IIT Bhilai during the year 2019-2020 | March 2, 2020 | March 9, 2020 |
Civil works at IIT Bhilai during the year 2019-2020 | March 2, 2020 | March 9, 2020 |
Catering and Mess Services for Hostel Castle Dio at IIT Bhilai
| February 28, 2020 | March 30, 2020 |
Supply and Installation of Access Switches at IIT Bhilai
| February 26, 2020 | March 16, 2020 |
Supply and Installation of One Two Port Glove Box
| February 26, 2020 | March 16, 2020 |
Supply and Installation of Multi Target Sputtering System.
| February 13, 2020 | March 30, 2020 |
Supply and Installation of Fuel Characterization Equipment at IIT Bhilai. | February 07, 2020 | March 05, 2020 |
Supply and Installation of Inverted Microscope System. | February 12, 2020 | March 09, 2020 |
Supply and Installation of Dynamic Light Scattering and Zeta Potential Measurement Instrument at IIT Bhilai. | February 03, 2020 | March 02, 2020 |
Supply and Installation of Real Time Digital Simulator at IIT Bhilai. | January 31, 2020 | February 24, 2020 |
Supply and Installation of Portable Emission Gas Analyzer Setup. | January 30, 2020 | March 02, 2020 |
Supply and Installation of High Speed Camera. | January 27, 2020 | February 24, 2020 |
Electrical Works at IIT Bhilai during the year 2019-2020. | January 24, 2020 | February 10, 2020 |
Supply, Installation & Commissioning of 100 MBPS (1:1) LEASED LINE INTERNET Connectivity at IIT Bhilai | January 14, 2020 | February 07, 2020 |
Supply and Installation of Circular Dichroism Spectrophotometer | January 06, 2020 | February 03, 2020 |
Electrical works at IIT Bhilai during the year 2019-2020 | January 03, 2020 | January 10, 2020 |
Supply and Installation of Pneumatic Trainer Module at IIT Bhilai | December 23, 2019 | January 23, 2020 |
Supply and Installation of Physical Vapour Deposition Coater at IIT Bhilai. | December 23, 2019 | January 14, 2020 |
Supply & Installation of Hostel Furniture at IIT Bhilai | December 20, 2019 | January 20, 2020 |
Installation of a Passenger Lift ( 8 Passangers Capacity) in Academic Building of IIT Bhilai, Sejbahar, Raipur.) | December 13, 2019 | December 23, 2020 |
Construction of Concrete Foundation for CNC Horizontal Turning Machine in Machin Lab , Room No B007 at Academic Building of IIT Bhilai, Raipur Campus. | December 13, 2019 | December 17, 2019 |
Supply and Installation of Contact Angle Measurement System with Accessories
| December 13, 2019 | January 09, 2020 |
Supply and Installation of e-beam based nano structure fabrication setup at IIT Bhilai. | December 10, 2019 | January 06, 2020 |
Supply and Installation of Contact type Surface Roughness Measurement Instrument at IIT Bhilai.
| December 09, 2019 | January 08, 2020 |
Supply and Installation of IR Thermal Camera Setup.
| December 06, 2019 | January 09, 2020 |
Supply and Installation of Confocal Raman Microscopy Setup.
| December 06, 2019 | January 06, 2020 |
Supply and Installation of Time Resolved Fluorescence Spectrometer.
| December 03, 2019 | December 30, 2019 |
Supply and Installation of UV‐VIS‐NIR Spectrofluorometer.
| December 03, 2019 | December 30, 2019 |